One month of downtime – caused by a single relay contact
SCHNEIDER PACDRIVE

One month of downtime – caused by a single relay contact

After about a month of downtime, the Schneider PacDrive fault was found in roughly two hours: an incorrectly wired contact on relay KA20.

📍 100% remote · 📅 2026

Learn more →
Replacing Weidmüller and restoring TPEM ↔ Siemens communication
WEIDMÜLLER → OWEN PLC210

Replacing Weidmüller and restoring TPEM ↔ Siemens communication

100% remote replacement of an unavailable Weidmüller communication controller with an OWEN PLC210, restoring Modbus RTU/TCP communication between TPEM and Siemens S7-1500.

📍 100% remote · 📅 2026

Learn more →
Fault on a Siemens SINAMICS servo drive
SERVO DRIVE

Fault on a Siemens SINAMICS servo drive

Diagnostics of a servo drive after water entered the motor and temporary line start without the critical axis.

📍 Khasavyurt, Russia · 📅 2026

Read more →
Diagnostics and repair of a Rapida 75
CAN BUS ERROR

Diagnostics and repair of a Rapida 75

Troubleshooting of a CAN bus error and recommissioning of a printing press after two months of downtime.

📍 Stavropol, Russia · 📅 2026

Read more →
Automatic packaging line for chipboard packages
PACKAGING LINE

Automatic packaging line for chipboard packages

Complete PLC/HMI development, installation support, commissioning and documentation of an automatic transport and packaging line for chipboard packages.

📍 Izhevsk, Russia · 📅 2026

Read more →
Emergency service on a plastic profile line
EMERGENCY SERVICE

Emergency service on a plastic profile line

Restoration of the Siemens S7-414 / Prisma / WEBFactory control system after a production stoppage.

📍 Moscow, Russia · 📅 2025

Read more →
Modernization of a 12-ton harbor crane
MODERNIZATION

Modernization of a 12-ton harbor crane

Replacement of obsolete Mannesmann converters with Emotron, STEP 7 adaptation and crane commissioning.

📍 Batumi, Georgia · 📅 2024

Read more →