Skip to PLC check
Back to modernization

Modernization / PLC check

Legacy PLC.
Your next step.

From an order number to a modernization concept. Check your controller and explore the technology and engineering work your upgrade may need.

Initial technical guidance · no registration

01Identify the system
02Explore a target
03Plan the project

JavaScript is required for the local check. You can also send your order number for a personal assessment.

Other ways to get in touch ↗

More than a replacement part

The number is the start.
The system decides.

Replacing a legacy CPU is an engineering project. This check makes the first steps visible.

01 / Existing system

Understand the controller

Identify software, I/O, HMI and communication.

02 / Concept

Develop the changeover

Plan the target system and software. Retain proven components where technically suitable.

03 / Implementation

Restore the functionality

Prepare, modify, test and hand over with an up-to-date backup.

Catalog scope and limitations

The starter catalog contains 19 specific CPU order numbers from SIMATIC S5, S7-200, S7-300 and S7-400. It does not cover every variant. Family hints inferred from number patterns are clearly marked. Target directions are our initial engineering guidance, not a Siemens replacement approval.

The S7-300/400 guide does not cover S7-400 migration in PCS 7. Manufacturer documents may be in a different language.
Sources checked: 12 October 2026